The Langlee, Waverley: EV Charging Case Study
Case study · Strata & residential
The Langlee, Waverley: EV Charging Case Study
One managed network for private, community and visitor EV charging in a luxury over-55s strata building in Sydney’s eastern suburbs.
Book a site assessmentDownload the PDF
The project
Mirvac redeveloped the former Waverley Bowling Club into The Langlee: 55 luxury apartments for over-55s, two new bowling greens, a wellness centre and the Waverley Greens venue, completed in 2023.
The brief was charging for now and for tomorrow. One system had to serve residents, their guests and the precinct’s other users, use energy efficiently, and grow with EV uptake without rework.
Charge N Go manages the EV charging system under managed services. The owners and the owners corporation own the chargers. Charge N Go operates, bills, monitors and reports.
The charging system
A backbone sized for the whole car park, with smart load management and a dedicated network to every charger.
400A Canalis busduct backbone
Schneider Electric busduct, installed by Aeron Group, carries power across the car park levels. Any bay can be connected with a short tap-off, not a new cable run.
Smart load management
Schneider EcoStruxure EV Charging Expert shares the available power across every charger in real time, so the building’s supply is never overloaded.
Schneider EVlink Pro AC chargers
7 kW and 22 kW chargers, wall-mounted and on pedestals, with remote monitoring and management built in.
Dedicated fibre network
A dedicated communications network with a fibre backbone links every charger to the Charge N Go platform for real-time monitoring and control.


Room for 80 more chargers, with no modifications or shutdowns
As more residents switch to EVs, new chargers simply plug into the existing backbone.
How it works
Private chargers
Owners opt in with a simple one-day install from the busduct to their own bay. The owner owns the charger; Charge N Go connects it, bills their charging and supports it.
Community chargers
Two 22 kW chargers on common property, open to anyone living in the building and their guests. Drivers pay per kWh in the app, with an instant receipt.
Charge N Go runs all nine chargers as one managed network, working hand in hand with the strata manager, Strata Plus, and the property manager, Covil.
Each month the owners corporation receives a usage report, a Recipient Created Tax Invoice (RCTI) and an electronic payment, with no billing work for the committee.

Results: February to October 2026
Energy delivered each month (kWh). Steady month after month, with all nine chargers online at the time of writing.
Monthly energy delivered (table)
| Month (2026) | Energy delivered (kWh) |
|---|---|
| February | 830 |
| March | 889 |
| April | 865 |
| May | 854 |
| June | 753 |
| July | 737 |
| August | 698 |
| September | 444 |
| October | 696 |
Why it works for your building
- Build the backbone once. Each new charger is a small, fast install, with no switchboard upgrades or disruption.
- Share what can be shared. Two community chargers serve every resident without a private charger, plus their guests.
- User pays, automatically. Every kWh is billed to the driver who used it, never to owners who don’t drive an EV.
- Zero admin for the committee. Reports, RCTI and payment arrive every month.
- Ready for growth. More owners opt in on the same network as EV ownership rises.
- Property appeal. In a premium building, ready-to-use charging is part of the lifestyle buyers and residents expect.

Common questions from strata committees
Can our building’s power supply handle EV charging?
Load management shares the available supply safely across every charger. NSW owners can now install a charger on their lot, so plan with an EV by-law, decide which chargers are private or community, and how energy is metered and repaid to the owners corporation.
How is EV charging funded in a strata building?
We check current grants for your building. Where none are open, Charge N Go can fund, own and operate community chargers for eligible buildings.
Who monitors the chargers?
OCPP-connected chargers report in real time. Faults are flagged straight away and most are fixed remotely, and you’re never locked to one supplier.
How do residents and guests pay?
Start, pay and get a receipt in the Charge N Go app or by QR code. RFID cards, session alerts and idle fees keep shared chargers moving.
More on how we run strata charging: EV charging for strata and residential buildings, retirement villages and the free NSW strata EV charging guide.
Download the full case study
Get the four-page PDF to share with your committee, owners or building manager. It covers the system, how private and community charging work together, and the month-by-month results.
Enter your details and the download starts straight away. We’ll also email you the link.
Make your building EV ready
We don’t just install chargers, we run them properly. 317+ chargers across 175+ active sites. Book a free site assessment and we’ll show you what this model looks like for your building.
Call 1800 940 799 or email enquirechargengo.au
Book a free site assessment
Tell us about your building and our team will get back to you.
Disclaimer: This case study is for general information only. Figures show the performance of the named site over the stated period and are not a forecast or guarantee of results at any other site. Usage, income and costs vary with location, electricity tariffs, pricing, charger type, EV uptake and site conditions. Charge N Go Australia Pty Ltd makes no representation that any site will achieve similar results. Nothing on this page is financial, legal or tax advice. Published with the permission of the site owner.